Construction Bid List

 
Submittal Deadline Project Project Description Solicitor
 6 November 2020 12:00 pm

Please submit your proposal via e-mail to sdoak@hoar.com

366/009-07-2019C
MTSU School of Concrete and Construction Management
Early Release Bid Package consists of a 1,140 sf expansion of an existing Satellite Chiller Plant building, including a new chiller, cooling tower, and extension of existing Chilled Water S&R lines to serve the future School of Concrete. Trades included in the chiller plant expansion include conventional footings and slab, load bearing masonry walls, and a steel framed roof system. A brick exterior skin, and an EPDM roof are also included.  Painting, drywall, sitework, fencing and full MEP services are also required.  In addition, the early release package includes abatement and complete demolition of two existing dormitory buildings 
Steve Doak
sdoak@hoar.com
205-423-2225
 24 November 2020 2:00 pm in Murfreesboro, TN
366/009-07-2019A
Recording Studios
The project involves the renovation of a 8,127 SF partial area of an existing pre-engineered metal building for use as recording studios for the MTSU Department of Recording Industry,  The Work includes the demolition of the existing interiors and the construction of two control rooms with adjacent studio live spaces.  The HVAC and electrical systems are replaced.  There is significant audio systems installation.  The majority of audio equipment is being supplied by the Owner.  Pre-Bid conference is mandatory which is on November 11, 2020 at 2:00 pm.
Stephen White
Bullock Smith & Partners, Inc.
swhite@bullocksmith.com
615-202-7111
       


Holmes Building
Address to bidding location

836 Champion Way
Room 111
Murfreesboro, TN 37132
Phone: 615-898-2411
 
Visitor Parking Pass is needed and must be obtained through Parking Services,